   At North Pole Heating and Air conditioning Ltd we provide a full range of HVAC services for new and retrofit commercial buildings. We install energy efficient rooftops, chillers, boilers, air quality controls and also specialize in in-floor heating / snow melting systems. Our specialized and experienced technicians are always available to service the client’s needs and provide top quality work & repairs in most cases within a single visit.
      
Recent Projects
  1. Saks Fifth Avenue
    Saks Fifth Avenue
    Description: The Hudson’s Bay Trading Company renovated and transformed 5 floor of retail space within the building to accommodate this project. This heritage building completed in 1896 will house 21,000sqft of new retail space. Our scope of work was to install all the ductwork distribution throughout the many high end floors along with all associate grill and diffusers.
  2. Gap's Distribution Center
    Gap's Distribution Center
    Description: The warehouse expansion of GAP’s Brampton Distribution Centre added a 360,000sqft to the original campus tied to the company’s original facilities. Our scope of work included all ductwork distribution though the warehouse area along with all associated grills and diffusers.
  3. Dowling Plaza
    Dowling Plaza
    Description: A commercial retail plaza consisting of 20 units and heritage home as and additional unit on a 2.32 Acres of land. The project has approximately 28,336 sqft of retail area with 135 parking spaces. Our scope was to install all the individual rooftop units serving each unit along with all associate gas piping and fittings.
  4. Emerald City D2/D4
    Emerald City D2/D4
    Description: The project construction includes a 20 Storey condominium and 10 townhouses, the total square footage for both areas are 264,000sq.ft. This also included an underground parking of approximately 60,000sq.ft. Our scope of work was to install all the sheetmetal work for this project including but not limited to the sheetmetal equipment and boiler venting.